Larger
Image >
Larger
Image > |
A six-building parish facility
includes the 16,000 square foot main church building that utilizes long
span steel framing. Other buildings in this complex include a 5,200
square foot wood-framed
Chapel and a 4,100 square foot wood-framed Pastoral Center all designed around
serene flower gardens and reflecting pools.
Completed in 1999, this facility was the
recipient of San Diego AIA's highest honor, the Grand Orchid, for
2000. Also, the Structural Engineers Association of San Diego presented
it the Excellence in Structural Engineering Award for 2000. |