The Navy's four story, structural steel repair facility (with overhead
cranes, a high bay repair area and heavy industrial equipment) was
constructed on a marine pier of pre-cast concrete piles with pre-cast
and cast-in-place concrete decks. The new pier is adjacent to and
seismically separate from an existing pier and required special
foundation considerations to avoid existing piles. This pier also
required design to Base berthing constraints with all associated ballards, equipment and utility services.