Construction
Begins 2004 - School Opens Fall 2005
This Design/Build project consists of a campus of five, two-story
buildings and a single story multipurpose facility. The two-story
buildings contain classrooms, kindergartens, administration services and
a second floor library. All of the buildings are comprised of structural
steel with steel braced frames for seismic resistance. In addition,
there are elevated walkways between the two-story buildings which
interconnect the second floors.
Architect: HMC Group, Inc.
Contractor:
Erickson-Hall Construction Co.
San Diego, California |